You don't have javascript enabled. Good luck with that.
Pencarian
Proses pemasangan beton u-ditch ke dalam saluran air di Lubang Buaya

Water Channel on Jalan Rawa Binong Being Improved

As many as 15 joint personnel are deployed to revitalize water channel on Jalan Rawa Binong, RT 01/10, Lubang Buaya, Cipayung District, East Jakarta.

This condition surely triggers inundation

Head Section of Economy and Development of Lubang Buaya Urban Village, Emi Wahyuni said the channel needs to be improved since the existing was not able to flow the water well.

Collapsed Channel Retaining Wall in Boulevard Timur Repaired

"This condition surely triggers inundation during rain," she said, Thursday (11/6).

She explained the channel revitalization is run along 85 meters by installing 120x100 cm u-ditch.

According to her, the work involves 15 personnel PPSU and Water Resources taskforce. One mini excavator is also deployed to accelerate the work.

"The work has been running since October 29, 2025 and is targeted for completion at the end of November," she explained.

Meanwhile, one of the local residents, Wahyu (49), appreciated the channel revitalization.

"Hopefully the revitalization can be completed on target," he hoped.

Linked News
Popular News indeks
  1. Fire at Pondok Bambu Allegedly Triggered by Electrical Short

    access_time19-05-2026 remove_red_eye1384 personNurito
  2. Governor Pramono Named Vice Chair of C40 Cities Steering Committee

    access_time18-05-2026 remove_red_eye1017 personAldi Geri Lumban Tobing
  3. Inundation on DI Panjaitan Road Recede

    access_time20-05-2026 remove_red_eye845 personNurito
  4. Dharma Jaya Ready for Thousands of Eid al-Adha Sacrifices

    access_time20-05-2026 remove_red_eye654 personAldi Geri Lumban Tobing
  5. Rasuna Said Car-Free Day to Return in June 2026

    access_time16-05-2026 remove_red_eye636 personAldi Geri Lumban Tobing